
Shortest setup times are achieved by the unique program-controlled screen change routine of the SPS® >jumbos<: at the push of a button, the top frame is raised into a medium height position, and the screen carrier swings out, opening for a quick pull-out / push-in change over. |
|

Reliable sheet run from pile to pile is a must with sheets of 3 m² and more: the elements of the mechanical sheet transport system and fine tuned air controls guide the substrate from feeder to stacker end - in perfect sync. The resulting production speed is unrivaled in the industry.
|